Materials yard at dawn — stacked concrete, timber and steel under low light

Structural materials supply — est. 1968

MASS

Three materials. Zero compromises.

The catalogue

Density

2400kg/m³

Embodied carbon

Moderate

Fire rating

4 hr

Typical span

9m

Cast in place or precast. The default mass of the modern city.

Supply, not suspense

Everything cut, batched and on your slab — on the date we said.

Lead times
Concrete 48 hr batch-to-pour · Timber 3 wk CLT/glulam from press · Steel 10 d from fabrication release
Cut to size
CNC timber joinery, plasma-cut steel plate, precast moulds to drawing. Tolerance held to ±2 mm.
Site delivery
Crane-sequenced loads, 06:00 slots, tagged per grid line. Your crew lifts, never sorts.
Projects

Forty-one towers, two stadiums and one very stubborn footbridge stand on material we supplied. Yours is next.

Request a quote Dock 4, Harbour Industrial Lands · Quotes within one working day

Want something like this for your brand?

Start a project → See more work